CASE STUDY

Closed-Loop Fracturing: First Field Deployment Results

June 2026
First field deployment with live subsurface feedback
33% Relative Improvement
6pp Efficiency Gain
Real-Time Intervention

Overview

First field deployment of a closed-loop fracturing workflow where live subsurface feedback guided real-time response during stimulation. Stages with CLF intervention showed 12% perforation efficiency degradation versus 18% without — a 33% relative improvement representing a 6 percentage point efficiency gain per stage.

Key Results

  • 33% relative improvement in perforation efficiency — stages with CLF intervention degraded only 12% versus 18% without intervention
  • First field deployment demonstrating that live subsurface feedback can be systematically used to guide treatment decisions intra-stage
  • 6 percentage point efficiency gain sustained across intervention stages — not a single-stage result but a repeatable, systematic outcome
  • Real-time SAFA measurements provided the decision inputs that surface treating pressure alone cannot supply

Unlock Complete Operational Metrics.
Access the full asset ledger, production benchmarking curves, and verified micro-interaction logs.
Fill out the form below to receive the full SPE paper.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
more case studies
Case Study
Jun 2026
Closed-Loop Fracturing: First Field Deployment Results
First field deployment of a closed-loop fracturing workflow where live subsurface feedback guided real-time response during stimulation. Stages with CLF intervention showed 12% perforation efficiency degradation vs. 18% without — a 33% relative improvement.
33% Relative Improvement
6pp Efficiency Gain
Real-Time Intervention
Case Study
Apr 2026
Multi-Well Pad Optimization: Uniformity Index Improvement
Across a 20-well Permian program, SAFA-guided completions improved average Uniformity Index from 0.42 to 0.74 — a 76% relative improvement in cluster flow distribution. Wells with UI above 0.7 showed 2.5% higher 12-month cumulative production per 0.1 UI increment.
Permian Basin
UI: 0.42 → 0.74
~$300K NPV Uplift/Well